Project Info
TTS Surfacing Limited carried out Tarmac works to a playground in Croydon, Surrey. The area measured 515m².
Area = 515m²
Dig out area equalling 135m² to a depth of 230mm and muck away.
Supply and lay 20LM of ACO and connect to existing solution.
Adjust ironwork.
Supply and lay 150mm of type 1 crushed concrete to area equalling 135m² and consolidate.
Supply and lay 50mm of 20mm base course macadam to area equalling 135m².
Regulate low areas.
Supply and lay 35mm of 6mm black wearing course macadam.
Capping stones = 51LM
Clean and prepare wall for new render.
Plaster wall with sand and cement in 2 coats.
Supply and lay 51LM of capping stones.
Paint in colour of choice.
Description
TTS Surfacing Limited carried out Tarmac works to a playground in Croydon, Surrey. The area measured 515m².