Resin Pathways in Crowthorne, Berkshire

Project Info

TTS Surfacing carried out these Resin Bound Pathways in Crowthorne, Berkshire. The resin colour chosen was a bespoke mix to match the existing resin on site.

 

Area = 228m²

Supply and lay 70mm of 14mm open base course macadam to an area equalling 70m².
Supply and lay 20mm of resin bound wearing course to an area equalling 228m².

 

Description

TTS Surfacing carried out these Resin Bound pathways in Crowthorne, Berkshire. The resin colour chosen was a bespoke mix to match the existing resin on site. 

Client:
Private client
Date:
26th August 2021
Location:
Crowthorne, Berkshire
Category:
Commercial case studies, Resin Bound Surfaces, Schools