Line Marking, Maidstone, Kent

Project Info

TTS Surfacing Limited carried out various works at including Line Marking at St. Michaels C of E Infant School in Maidstone, Kent.

Astro turf area tarmac = 54m² – Dig out area to a depth of 180mm and muck away.
Supply and lay 6 linear meters of concrete edging to surround tree.
Supply and lay 100mm of type 1 crushed concrete and consolidate.
Supply and lay 50mm base course macadam.
Supply and lay 30mm of 6mm wearing course macadam.
Rear entrance area overlay = 24m² – Break out high and root affected areas
Cut joint in existing tarmac and break out for level joints.
Regulate low areas.
Supply and lay 30mm on average of 6mm
wearing course macadam.
Line marking – Supply and apply thermoplastic line marking to tarmac, in 1 visit during the week, as specified‐
Mark out Road “track” as per picture provided with outline to roads white.

Description

TTS Surfacing Limited carried out various works at including Line Marking at St. Michaels C of E Infant School in Maidstone, Kent.

Client:
St. Michaels C of E Infant School
Date:
13th February 2022
Location:
Maidstone, Kent
Category:
Line Marking